Published as of 07 NOV 2023

NR/YearAIP section(s) affectedPeriod of validity
 Subject
19/2020From 26 NOV 2020 to UFN
 KOTA KINABALU FLIGHT INFORMATION REGION
KOTA KINABALU INTERNATIONAL AIRPORT
THE PROPOSED PARKING APRON EXPANSION, RECONFIGURATION OF AIRCRAFT STAND,
PAVEMENT REHABILITATION AND ITS ASSOCIATED WORKS
WORK SCHEDULE AND MOVEMENT AREAS RESTRICTION
21/2022From 15 NOV 2022 to 31 OCT 2024 EST
 EFFECTIVE DATE: 15 NOVEMBER 2022

TAWAU AIRPORT AERODROME -
INSTRUMENT LANDING SYSTEM WITHDRAWAL
22/2022From 01 DEC 2022 to 16 NOV 2023
 LIMBANG AIRPORT AERODROME -
AERODROME OPERATIONAL HOURS
27/2022From 13 DEC 2022 to 30 NOV 2023
 
LABUAN AIRPORT AERODROME -
AERODROME OPERATIONAL HOURS
05/2023From 09 FEB 2023 to UFN
 SUBANG AIRPORT (WMSA)ILS RWY 15 WITHDRAWAL
06/2023From 23 FEB 2023 to UFN
 SIBU AIRPORT (WBGS)ILS RWY 13 WITHDRAWAL
07/2023From 16 FEB 2023 to UFN
 BINTULU AIRPORT AERODROME (WBGB) -
TEMPORARY CONSTRUCTION - TOWER CRANE OPERATION
09/2023From 20 APR 2023 to 31 DEC 2023
 EFFECTIVE DATE: 20 APRIL 2023

SULTAN AZLAN SHAH AIRPORT (WMKI)
AERODROME OPERATIONAL HOURS
12/2023From 09 MAR 2023 to UFN
 
KUALA LUMPUR INTERNATIONAL AIRPORT (WMKK)
WORK IN PROGRESS
17/2023From 16 MAR 2023 to 31 AUG 2025 EST
 
KERTEH AIRPORT (WMKE)
SECTION 5 ECRL PROJECT SITE CONSTRUCTION WORK
18/2023From 30 MAR 2023 to 31 DEC 2023 EST
 SUBANG - SULTAN ABDUL AZIZ SHAH AIRPORT (WMSA)
SUSPENSION OF INSTRUMENT APPROACH PROCEDURE (IAP) RNP Y RWY15
19/2023From 04 APR 2023 to 31 DEC 2023 EST
 
KUALA LUMPUR INTERNATIONAL AIRPORT (WMKK)
TAXIWAY CLOSE FOR AIRCRAFT LONG LAYOVER PARKING

(This AIP Supplement replaces AIP Supplement 13/2023)
22/2023From 11 MAY 2023 to 12 FEB 2025
 PENANG INTERNATIONAL AIRPORT (WMKP)
TEMPORARY OBSTACLES – CRANES OPERATION
24/2023From 22 JUN 2023 to UFN
 MULU AIRPORT (WBMU)
RUNWAY SURFACE CRACK AND DEPRESSION
25/2023From 14 JUL 2023 to 31 DEC 2023
 KUALA LUMPUR INTERNATIONAL AIRPORT AERODROME (WMKK)
WORK IN PROGRESS

(This AIP Supplement replaces AIRAC AIP Supplement 08/2022)
26/2023From 14 JUL 2023 to 17 MAY 2025
 PENANG INTERNATIONAL AIRPORT (WMKP)
TEMPORARY OBSTACLES - CRANES OPERATION
27/2023From 27 JUL 2023 to 31 OCT 2024
 BINTULU AIRPORT (WBGB)
TEMPORARY CONSTRUCTION - TOWER CRANE OPERATION
29/2023From 07 SEP 2023 to 31 MAR 2024
 EFFECTIVE DATE: 1 OKTOBER 2023


KUALA TERENGGANU SULTAN MAHMUD AIRPORT (WMKN)
TEMPORARY CHANGES OF AERODROME OPERATION HOURS
32/2023From 10 AUG 2023 to 31 DEC 2024 EST
 
KUALA LUMPUR INTERNATIONAL AIRPORT (WMKK)
WORK IN PROGRESS
33/2023From 10 AUG 2023 to 31 DEC 2023
 
MALACCA AIRPORT (WMKM)
TEMPORARY CHANGES OF RESCUE AND FIRE FIGHTING SERVICES

(This AIP Supplement replaces AIP Supplement 16/2023)
35/2023From 12 SEP 2023 to 31 MAR 2024
 TANJUNG MANIS AIRPORT (WBTM)
TEMPORARY CHANGES OF RESCUE AND FIRE FIGHTING SERVICES
36/2023From 01 DEC 2023 to 31 DEC 2024
 KOTA BHARU / SULTAN ISMAIL PETRA AIRPORT (WMKC)
UPGRADING WORKS

(This AIP Supplement replaces AIRAC AIP Supplement 02/2022)
37/2023From 11 OCT 2023 to 18 MAY 2024 EST
 MALACCA AIRPORT (WMKM)
SUSPENSION OF INSTRUMENT APPROACH PROCEDURE
(IAP) RWY03
38/2023From 30 NOV 2023 to 31 JAN 2024
 
LABUAN AIRPORT (WBKL)
TWY K, VISUAL DOCKING AND GUIDANCE SYSTEM (VDGS)

Published as of 07 NOV 2023

NR/YearEffective dateSeries
 Subject
07/200020 MAR 2000-
 OPERATIONAL FLIGHT PLAN
10/200111 OCT 2001-
 ADDITIONAL SECURITY MEASURES TO BE ADOPTED FOR FLIGHTS INTO UNITED STATES OF AMERICA, UNITED KINGDOM AND AUSTRALIA
06/200526 MAY 2005-
 A FLIGHT ENGINEER’S LICENCE
21/200518 AUG 2005-
 ENGLISH LANGUAGE PROFICIENCY
26/200515 SEP 2005-
 406 MHZ. DISTRESS BEACON REGISTRATION FOR AIRCRAFT
30/200507 NOV 2005-
 INSPECTION AND INVESTIGATION OF AIR ACCIDENTS
01/200624 APR 2006-
 PROCEDURE NAMING FOR ARRIVAL AND APPROACH CHARTS
03/200831 JAN 2008-
 ADS CPDLC OPERATIONAL TRIAL IN BAY OF BENGAL AREA WITHIN KUALA LUMPUR FIR
10/200815 OCT 2008-
 APPLICATION OF ECONOMICAL DESCENT SPEED WITHIN KUALA LUMPUR AND KOTA KINABALU FIRS
04/201005 AUG 2010-
 COLLECTION OF PASSENGER SERVICE CHARGE (PSC) AND PASSENGER SECURITY SERVICE CHARGE (PSSC) AT KL INTERNATIONAL AIRPORT
01/201223 MAY 2012-
 RE-CATEGORISATION OF “NO-FLY ZONE” TO “RISK AREA” FOR HELICOPTER OPERATIONS IN SABAH AND SARAWAK
02/201206 JUN 2012-
 VISUAL DEPARTURE
04/201215 OCT 2012-
 IMPLEMENTATION OF AMENDMENT 1 TO THE 15th EDITION OF PROCEDURES FOR AIR NAVIGATION SERVICES – AIR TRAFFIC MANAGEMENT (PANS-ATM, Doc 4444) The New ICAO FPL 2012
01/201307 JAN 2013-
 PERFORMANCE BASED NAVIGATION (PBN) IMPLEMENTATION IN MALAYSIA
02/201307 JAN 2013-
 PERFORMANCE BASED NAVIGATION OPERATIONAL APPROVAL
03/201307 JAN 2013-
 INSTRUMENT FLIGHT PROCEDURE DESIGNAUTHORISATION OF THIRD PARTY DESIGN ORGANISATIONS
03/201429 JAN 2014-
 KUALA LUMPUR FLIGHT INFORMATION REGIONIMPLEMENTATION OF SIMULTANEOUS PARALLEL OPERATIONS AT KL INTERNATIONAL AIRPORT
05/201425 SEP 2014-
 KUALA LUMPUR FLIGHT INFORMATION REGIONSITE PREPARATION OF THE DESIGN,MANUFACTURE, SUPPLY,DELIVERY, INSTALLATION, TESTING AND COMMISSIONINGFOUR (4) INSTRUMENT LANDING SYSTEM (ILS) CATEGORY IIFOR RUNWAY 14 LEFT/32 RIGHT AND 14 RIGHT/32 LEFT ATKL INTERNATIONAL AIRPORT
01/201501 AUG 2015-
 DISTRIBUTED MULTI-NODAL ATFM OPERATIONAL TRIAL
01/201701 FEB 2017-
 KOTA KINABALU FLIGHT INFORMATION REGIONESTABLISHMENT OF EASTERN SABAH SECURITY ZONE (ESSZONE) TEMPORARY RESERVED AREA (TRA) AND TEMPORARY SEGREGATED AREA (TSA)
02/201707 SEP 2017-
 KUALA LUMPUR FLIGHT INFORMATION REGIONCONSTRUCTION AND OPERATION OF NEW AIR TRAFFIC CONTROL CENTRE COMPLEXAT KLIA SEPANG.INSTALLATION OF NEW COMMUNICATION, NAVIGATION, SURVEILLANCE AND AIR TRAFFICMANAGEMENT SYSTEM (CNS/ATM)
03/201707 SEP 2017-
 IMPLEMENTATION OF AUTOMATIC DEPENDANT SURVEILLANCE (ADS-B) OUT IN MALAYSIA
04/201719 SEP 2017-
 KUALA LUMPUR FLIGHT INFORMATION REGIONREPLACEMENT OF TERMINAL APPROACH RADAR STATION AT LANGKAWI INTERNATIONALAIRPORT AND TRANSPORTABLE RADAR AT KL INTERNATIONAL AIRPORT, SEPANGINSTALLATION OF NEW SECONDARY SURVEILLANCE RADAR IN MERSING
05/201719 SEP 2017-
 KOTA KINABALU FLIGHT INFORMATION REGIONNEW MUKAH AIRPORTPROPOSED NEW MUKAH AIRPORT FOR CODE 3C AIRCRAFT OPERATIONS,MUKAH, SARAWAK
07/201707 DEC 2017-
 KOTA KINABALU FLIGHT INFORMATION REGIONLAHAD DATU AIRPORTPROPOSED CONSTRUCTION OF HELICOPTER FORWARD OPERATING BASE (FOB)AT LAHAD DATU AIRPORT, SABAH
02/201812 OCT 2018-
 NEW LANDING/OVERFLIGHT PERMIT APPLICATION PROCEDURE FOR ALL SCHEDULED AND NON-SCHEDULED COMMERCIAL FLIGHTS OPERATING TO AND FROM MALAYSIA: AEROFILE
04/201801 JAN 2019-
 TERMINATION OF REPETITIVE FLIGHT PLAN (RPL) SYSTEMWITHIN THE KUALA LUMPUR AND KOTA KINABALU FIRs
05/201819 DEC 2018-
 KUALA LUMPUR FLIGHT INFORMATION REGIONIMPLEMENTATION OF GROUND BASED AUGMENTATION SYSTEM (GBAS)AT KL INTERNATIONAL AIRPORT SEPANG
04/202015 DEC 2020-
 CIVIL AVIATION AUTHORITY OF MALAYSIA APPROVED MEDICAL EXAMINERS
03/202128 JUN 2021-
 KUALA LUMPUR FLIGHT INFORMATION REGION (KL FIR) ROUTE AIR NAVIGATION SERVICES (RANS) CHARGES REVISED CHARGEABLE DISTANCES
04/202101 JUL 2021-
 VALIDATION OF FOREIGN AIR OPERATOR CERTIFICATE
01/202207 APR 2022-
 AIP, AIP AMENDMENT, AIP SUPPLEMENT AND AIC AS ELECTRONIC DOCUMENT ONLY
02/202207 APR 2022-
 FORECAST PROVISION OF DIGITAL/ELECTRONIC TERRAIN, OBSTACLE ANDAERODROME MAPPING DATA SETS
04/202228 JUL 2022-
 NEW LANDING/OVERFLIGHT PERMIT APPLICATION PROCEDURE FOR ALL NON-SCHEDULED NON-COMMERCIAL FLIGHTS OPERATING TO AND FROM MALAYSIA: NOSAS
05/202208 SEP 2022-
 INTRODUCTION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) AT KUALA LUMPUR INTERNATIONAL AIRPORT (KUL)
07/202217 NOV 2022-
 AIS PUBLICATIONS SCHEDULE FOR THE YEAR 2023
08/202213 DEC 2022-
 CHECKLIST OF AIC CURRENTLY IN FORCE
01/202314 MAR 2023-
 KUCHING INTERNATIONAL AIRPORT (WBGG) PROPOSED NEW ROYAL MALAYSIA POLICE AIR OPERATIONS FORCE BASE, SARAWAK